Client: SITA UK
Date: November
Scope: 5 sites with mutiple leachate wells
Recently completed the sites where drilled with a 450mm auto ejecting barrel to depths of 46m. The wells required temporary 406mm diameter steel casing due to high levels of leachate to install 315mm PE pipe or 250mm diameter permanent steel pipe.
Client: SITA Power
Date: December
Scope: 28no gas wells
Recently conpleted through the worst winter for years 28no gas wells where installed to depth of 20m and installed with 125mm diameter PE casing. The second phase to start April 2010 will have another 28 wells with 140mm steel and 125mm PE casing.
Client: AD Waste
Date: November
Scope: 6no 450mm Leachate Wells
Working in some of the worst weather for a number of years we completed the first phase for the remedial installation of 6no leachate wells and pumping equipment. The wells where drilled with a 450mm barrel auger to depths of 48m before being temporarily cased with 406mm steel liners to protect the 110mm and 180mm permanent liners and gravel pack. The completion phase of the project to install additional wells is to be completed in April 2010 to similar depths.
Client: Waste Recycling Group
Date: August
Scope: 16no 450mm leachate wells
After a slow start this project completed succefully and within budget for the installation of the 18 wells to varying depths. All were temporarily cased with 406mm steel to allow the installation of 160mm diameter PE casing.
Client: Cory Environmental
Date: August
Scope: Gas wells to 5 sites
After succeful bidding we where awarded the contract to Cory Environmental sites throughout the North West and Souther areas to install 125mm gas wells.